Skip to main content

Table 4 Average daily total reprocessing and personnel labour times

From: Comparative cost-efficiency of the EVOTECH endoscope cleaner and reprocessor versus manual cleaning plus automated endoscope reprocessing in a real-world Canadian hospital endoscopy setting

 

Colonoscopes

Gastroscopes

Bronchoscopes

Typical average number of scopes per day

22

14

4

Total reprocessing time

EVOTECH ECR

Average time per scope (mins)

38.22

37.92

36.99

Total daily reprocessing time (mins)

839

518

151

Manual cleaning plus AER

Average time per scope (mins)

50.29

44.24

42.64

Total daily reprocessing time (mins)

1104

604

174

Difference between EVOTECH ECR and Manual cleaning plus AER

Savings in total reprocessing time with EVOTECH ECR (mins)

265

86

23

Total daily time savings for reprocessing all scopes

374 minutes; 6.2 hours

Labour only time

EVOTECH ECR

Average time per scope (mins)

7.22

6.92

5.99

Total daily labour time (mins)

159

95

24

Manual cleaning plus AER

Average time per scope (mins)

10.29

9.24

7.64

Total daily labour time (mins)

226

126

31

Difference between EVOTECH ECR and Manual cleaning plus AER

Savings in total reprocessing time with EVOTECH ECR (mins)

67

32

7

Total daily time savings for reprocessing all scopes

106 minutes; 1.8 hours