Base-case | Cost |
---|---|
EGD + WC | 1474.80 |
ESM + WC | 1014.40 |
ESM + SC | 906.00 |
Sensitivity analyses | |
ESM + WC with 2% failure | 981.32 |
ESM + WC with 5% failure | 991.26 |
ESM + WC with 15% failure | 1024.39 |
ESM + SC with 90% absenteeism | 887.97 |
Threshold cost of WC | 192.91 |
Time costs excluded | |
EGD + WC | 1155.80 |
ESM + WC | 968.60 |
ESM + SC | 726.00 |